Westinghouse eVinci TM nuclear micro-reactor, sporting a diameter of less than 10 ft.

Is Nuclear Energy a Sustainable Power Source for Data Centers?

By: Filippo Di Giovanni, Data Centre Digest Contributing Editor

Since the advent of large-scale computing, data centers have expanded steadily, driven by growing demand for enterprise applications, cloud services and digital storage. Their electricity requirements also grew, but improvements in power electronics, computing efficiency and cooling helped keep the increase manageable.

Artificial intelligence (AI) is changing this balance. Training and running increasingly complex AI models requires enormous parallel-processing capacity based on GPUs, TPUs and other accelerators. Rack power densities that once typically remained below 10 kW are now commonly exceeding 100 kW for dedicated AI hardware, with the latest platforms reaching 130-140 kW per rack, while some AI infrastructures are quickly moving to several hundred kW, or even 1MW by the end of this decade. At the facility level, data centers that once consumed tens of megawatts are increasingly being designed for hundreds of megawatts, while gigawatt-scale campuses are being contemplated in road maps.

Microsoft data center server room (source: Microsoft 1 )

This relentless expansion is creating a dilemma. While the economic and scientific advantages of AI are driving the buildout of computing infrastructure, public opposition to new data centers is also growing. Communities in the United States are increasingly alarmed by their electricity and water consumption, environmental impact, noise, land use, and potential effects on local utility bills.

The energy challenge is therefore becoming a question of whether that electricity can be delivered reliably, at the required scale and with sufficiently low environmental footprint to make future data center rollouts socially and economically sustainable. The International Energy Agency estimates that global data center electricity consumption could double by 2030 to around 945 TWh, while grid constraints could delay 20% of global data center capacity planned for construction by 2030.

Time to Pace AI Development?

Ever-growing AI infrastructure is no longer a given. Anthropic’s CEO Dario Amodei recently called for a more cautious pace of AI development to allow safety measures to catch up, a stance OpenAI’s Sam Altman publicly endorsed. Whether such calls will materially affect planned data center deployments remains to be seen.

For now, however, they add a new dimension to an already complex question: how much computing infrastructure and energy will the AI economy ultimately require, and how can power be supplied without eroding public support?

Nuclear Power Moves Closer to the Data Center

In this context, nuclear fission looks attractive as a potential source of abundant, reliable and low-emission electricity for large scale computing in data centers. Unlike intermittent renewable sources, nuclear generation provides continuous power, while a new generation of compact, environmentally-friendly reactors could eventually enable more flexible deployment.

Companies like Amazon, Google, and Microsoft are considering nuclear power plants of the latest generation, based on small modular reactors (SMRs) to provide carbon-free electricity. Amazon has invested in advanced nuclear technologies and has agreements supporting SMR development with Energy Northwest in Washington State, initially targeting 320 MW and allowing expansion to 960 MW. It has also reached an agreement giving its AWS division access to electricity from the existing nuclear facility in Pennsylvania, with up to 1.9 GW available to support its data-center operations.

In 2025, Google, Kairos Power and the Tennessee Valley Authority announced the first project for a 50-MW reactor whose electricity will support Google’s data centers in Tennessee and Alabama, the first step in a plan targeting 500 MW of new advanced nuclear capacity by 2035. While additional nuclear power can be hooked to the current grid and supply data centers through existing transmission infrastructure, or advanced modular reactors, the new approach could eventually provide dedicated generation at or near a data center campus, reducing reliance on constrained transmission lines and providing a highly controllable source of electricity.

For AI infrastructure, therefore, the attraction of nuclear energy is not simply its low-carbon intensity and the relatively abundance of fissile materials. It is the combination of continuous availability, high power density and scalability. As individual data centers move toward hundreds of megawatts and larger AI campuses approach the gigawatt scale, these characteristics could make nuclear power an important complement to renewable generation.

How an SMR Works

In a nuclear reactor like an SMR, heavy atomic nuclei, mainly Uranium-235, break apart into lighter nuclei when struck by a neutron with the appropriate energy. Some reactor designs can also use Plutonium-239 as fissile fuel or convert fertile Thorium-232 into fissile Uranium-233. When a nucleus splits, it releases two or three additional neutrons that can go on to induce fission in other nuclei. The resulting chain reaction releases large amounts of kinetic energy from the fission fragments and energetic gamma rays, on the order of 200 MeV per fission event. This energy is transferred to the reactor coolant and then converted into useful heat. If fully fissioned, 1 kilogram of uranium-235 yields roughly 24,000 MWh of thermal energy, about two million times the energy released by burning an equivalent mass of coal.

At a typical thermal-to-electrical efficiency of 33%, a simplified calculation suggests that matching this output (7,920 MWh) would require roughly 6 acres (2.4 hectares) of solar-panel area operating for a full year, even in a high-solar-irradiance state like California. This is a vivid picture of nuclear fuel’s energy density.2

Westinghouse eVinci TM nuclear micro-reactor, sporting a diameter of less than 10 ft.
It has no moving parts and can be swapped out for refueling (source: Westinghouse)

Modern Small-scale Nuclear Power Plants

SMRs have an electric power output of up to 300 MWe per unit, representing one-third of the generating capacity of a traditional nuclear plant. Compact in size and modularity, they can be pre-assembled in plants and transported to the final site. Moreover, SMRs generally require less frequent refueling, on average every 3 to 7 years even, but some are specifically designed to operate for up to 30 years before being refueled.

Safety is another important consideration. Many advanced SMR designs incorporate passive safety systems that can shut down the reactor and remove residual heat, even before human intervention becomes necessary. These features can simplify reactor safety systems, but they do not eliminate the need for rigorous licensing, scrupulous safety assessment, and emergency planning.

The Economics and Timing of SMRs

The economic case for SMRs is strongly linked to their modularity. Unlike conventional nuclear plants, which require very large upfront investments and can take a decade before being fully operational, SMRs are designed around smaller units, and standardized components.

Yet their economics are not automatically superior. The U.S. Energy Information Administration estimated an overnight capital cost of about $8,900/kW for a representative 480-MW SMR plant, based on 2023 costs. For first-of-a-kind advanced nuclear plants, the U.S. DOE estimates costs of roughly $6,000–$10,000/kW. These figures illustrate why the economic promise of SMRs depends heavily on moving beyond expensive first-of-a- kind projects toward serial production.

The potential advantage lies in the learning effects of repeatable manufacturing. The DOE estimates that repeated iterations of the same standardized design could eventually reduce overnight capital costs by about 40%, as project planning, standardization, construction, modularization and supply chains improve. This could lower the initial investment per unit, shorten construction schedules and allow capacity to be added progressively as electricity demand grows. The key question, therefore, is not simply whether an individual SMR is cheaper than a conventional reactor, but whether a fleet of standardized units can achieve the economies of repetition that a first project cannot.

Powering AI Without Overloading the Planet

As AI becomes more pervasive, data centers are becoming some of the most energy-hungry infrastructures in the digital economy. Meeting their rapidly growing demand will require more than simply building new generation capacity. Renewable energy, grid expansion, novel 800 VDC distribution architectures, and advanced nuclear power will need to work in tandem, while power electronics can reduce the amount of electricity ultimately required by the computing load.

Nuclear fission, particularly through advanced reactors and SMRs, could complement variable renewable generation by supplying stable, low-carbon power at the scale required by future AI farms. Ultimately, the objective should be to diversify energy sources to build an energy architecture capable of supporting AI growth without hurting the planet, or the communities hosting its data centers.

References

1) https://news.microsoft.com/source/features/innovation/microsofts-virtual-datacenter-grounds-the-cloud-in-reality/

2) Assuming 1 kW of installed PV capacity yields 1,635 kWh/year, a solar irradiance of 1,000 W/m2, and a solar-panel efficiency of 20%. 6 acres correspond to roughly 3.5 soccer pitches