Subscribe to Our Digest
The Salgenx IT1000 is a 1 MW modular, high-efficiency natural-gas supercritical CO₂ turbine generator that provides data center operators with true energy autonomy while reducing strain on regional grids already facing unprecedented load growth.
Salgenx has announced the launch of the IT1000, a groundbreaking 1,000 kW gas turbine engineered specifically for data centers, high-performance computing sites, and grid-scale energy storage integration. Designed as a modular, transportable power block, the IT1000 delivers high-efficiency, on-demand power while enabling data centers to achieve new levels of resilience, energy independence, and operational cost savings.
The IT1000 integrates seamlessly with the Salgenx Grid Scale Battery, providing fast-response charging capability and supporting power smoothing for mission-critical loads. At its core, the IT1000 uses an advanced supercritical CO2 Brayton Cycle with closed-loop CO2 as the working fluid, offering high thermal efficiency, safety, and unmatched energy density.
The IT1000 is engineered for the rapidly expanding data center sector, where stable, scalable, and low-cost power is an operational necessity. The IT1000 represents a pivotal shift in how data centers secure and manage energy. By merging natural gas, waste-heat recovery, and a closed-loop supercritical CO2 system, the unit creates a turbine platform that exceeds legacy efficiency benchmarks while providing grid independence for mission-critical operations.
The IT1000 elevates traditional power block design by combining natural gas combustion with direct-use waste heat from microturbine exhaust streams. This allows data centers and industrial sites to stack multiple heat sources into a single, highly efficient power module.
The system’s closed-loop CO2 Brayton Cycle delivers exceptional energy density and compactness, enabling the entire 1 MW power block to be housed in a 40-ft high-cube steel container. The result is a unit that can be transported anywhere, rapidly deployed, and integrated into existing infrastructure without costly construction.
With the explosive growth of AI workloads, cloud computing, crypto and high-density GPU clusters, power reliability and thermal efficiency have become strategic priorities for global data center operators. The IT1000 is purpose-built to meet these challenges, offering:
The Salgenx IT1000 is now available for project integration, OEM partnership, and licensing opportunities. Production reservations for 2026 are currently being accepted.
More information about the IT1000 natural gas CO₂ turbine generator from Salgenx